TECHNICAL SERVICE BULLETIN: SERVICE ACTION: ICCU-VCU S/W UPGRADE FOR EWP OPERATION AND ICCU REPLACEMENT (SA570) - This bulletin has been revised to include additional information. New/revised sections of this bulletin are indicated by a black bar in the margin area. This bulletin provides information to improve the Electric Water Pump (EWP) operation logic when the EV battery is being charged with a Level 1 or Level 2 (120-240 Volt) AC charger on certain 2024MY EV9 (MV) vehicles produced from September 25, 2023 through January 11, 2024. A disparity may occur between the actual temperature and sensed temperature of the Integrated Charging Control Unit (ICCU) during high-current AC charging, predominantly in cold weather environments. If this condition occurs, the ICCU may become damaged and exhibit a MIL ON with the DTC(s) listed below, resulting in a stopped charging session and inability to charge using Level 1 or 2 AC chargers; however, the EV battery can still be charged using Level 3 DC fast charging, and the vehicle's drivability is unaffected. This software upgrade may also be available via Over The Air (OTA) through Kia Connect if it has been activated.
NANHTSA · boletim do fabricante11004385
Boletins técnicos
Exibido no inglês original · tradução pendente
Abrange: Kia EV9 (Anos-modelo 2024)
Fontes: NHTSA (Estados Unidos, domínio público), Transport Canada (Open Government Licence – Canada), DVSA (Reino Unido, Open Government Licence v3.0), RappelConso e Safety Gate da UE (França, Licence Ouverte 2.0), MLIT (Japão, Licença de Dados Públicos 1.0) e MOLIT (Coreia do Sul, car.go.kr).