PROCESS FOR 12V BATTERY TESTING APPLIED VEHICLES: 2026 LEAF (ZE2) SERVICE INFORMATION Due to changes to the DC-DC control logic, 12V battery testing may take an extra 20 minutes or more. To perform a faster 12V battery test, the DC-DC deactivation process must be completed which deactivates the DC-DC power supply for 1 hour. The 12V battery must be diagnosed or removed within 1 hour or power supply may be restored unintentionally. The DC-DC deactivation process is in the Electronic Service Manual (ESM) under Precautions for Removing Battery Terminal. Refer to the ESM: ELECTRICAL & POWER CONTROL > POWER SUPPLY, GROUND & CIRCUIT ELEMENTS > PRECAUTION > PRECAUTIONS FOR REMOVING BATTERY TERMINAL > Precautions for Removing Battery Terminal If the 12V battery is not replaced after testing, verify the power switch has been pressed to cycle the ignition to ACC mode ON and then back to ACC mode OFF to re-enable the DC-DC system which maintains the 12V battery.
NANHTSA · bulletin constructeur11024394
Bulletins techniques
Affiché en anglais d’origine · traduction en attente
Concerne: Nissan Leaf III (Années modèle 2026)
Sources : NHTSA (États-Unis, domaine public), Transports Canada (Licence du gouvernement ouvert – Canada), DVSA (Royaume-Uni, Open Government Licence v3.0), RappelConso et Safety Gate de l'UE (France, Licence Ouverte 2.0), MLIT (Japon, licence de données publiques 1.0) et MOLIT (Corée du Sud, car.go.kr).