閲覧無料 · 投稿は無料アカウントでAnticars(2000年)の後継
ログインアカウント作成
NANHTSA · メーカー通報11004385

技術サービス通報

原文(英語)で表示中 · 翻訳待ち

TECHNICAL SERVICE BULLETIN: SERVICE ACTION: ICCU-VCU S/W UPGRADE FOR EWP OPERATION AND ICCU REPLACEMENT (SA570) - This bulletin has been revised to include additional information. New/revised sections of this bulletin are indicated by a black bar in the margin area. This bulletin provides information to improve the Electric Water Pump (EWP) operation logic when the EV battery is being charged with a Level 1 or Level 2 (120-240 Volt) AC charger on certain 2024MY EV9 (MV) vehicles produced from September 25, 2023 through January 11, 2024. A disparity may occur between the actual temperature and sensed temperature of the Integrated Charging Control Unit (ICCU) during high-current AC charging, predominantly in cold weather environments. If this condition occurs, the ICCU may become damaged and exhibit a MIL ON with the DTC(s) listed below, resulting in a stopped charging session and inability to charge using Level 1 or 2 AC chargers; however, the EV battery can still be charged using Level 3 DC fast charging, and the vehicle's drivability is unaffected. This software upgrade may also be available via Over The Air (OTA) through Kia Connect if it has been activated.

対象: Kia EV9 (モデルイヤー 2024)

公式情報 ↗

出典:NHTSA(米国、パブリックドメイン)、カナダ運輸省(Open Government Licence – Canada)、DVSA(英国、Open Government Licence v3.0)、RappelConso および EU Safety Gate(フランス、Licence Ouverte 2.0)、国土交通省(日本、公共データ利用規約1.0)、韓国国土交通部(car.go.kr)。