It has been identified that during the fuel tank production process the joint between the tank and the fuel supply pipe assembly may not have been produced to the correct standard. Should this indeed be the case leakage from the supply pipe area of the fuel tank might occur.
Due to an error in the fuel tank production process, the tank may rupture and leak. As a consequence, fuel may spill onto the road and create a hazard for following traffic.
It has been established that the con-rod (big end) shell bearings may not have been manufactured to specification. This could lead to premature deterioration of the shells and if not identified it could result in engine failure.
Due to incorrect machining it is possible that the crankshaft is not to the correct specification which can lead to insufficient lubrication of the crankshaft and subsequent engine failure.